On Monday the bulldozer leveled the ground for the building that will be the centerpiece of our Outdoor Classroom.
The students were fascinated. Yesterday the big cement truck came and cement was poured into holes in the ground. There was a large cheering section as the cement poured out of the mixer and into the wheelbarrows. Today they will sink large beams into the concrete, and then the framing will begin.
No comments:
Post a Comment